I am evaluating PSA in Dynamics 365 Online.
I have followed all the tutorials and as far as I understand the Project Contract is just an extension to the Order table.
If I have a Project Contract, I select the drop down box to change it to a regular sales order.
The form flashes a few times and then reverts back.
The same happens if I go from a regular Sales Order to a Project Contract.
If these are the same table, should I not be able to convert the order?
What steps would have to happen for this to happen.
Thanks